Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
445
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1017 # 03 Y:2020 | 03 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,662 | $17,500 | Implemented |
UD1017 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $20,892 | $0 | Implemented |
UD1017 # 04 Y:2020 | 04 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $2,299 | $0 | Implemented |
UD1017 # 02 Y:2020 | 02 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,500 | $0 | Implemented |
CW0113 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $941 | $105 | Implemented |
CW0113 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,683 | $10,280 | Implemented |
CW0113 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $583 | $1,600 | Implemented |
CW0113 # 01 Y:2020 | 01 | 2020 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $3,565 | $1,858 | Implemented |
WV0578 # 06 Y:2019 | 06 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $5,469 | $692 | Implemented |
WV0578 # 05 Y:2019 | 05 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,104 | $3,500 | Implemented |
WV0578 # 10 Y:2019 | 10 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $174 | $221 | Implemented |
WV0578 # 09 Y:2019 | 09 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,217 | $46 | Implemented |
WV0566 # 10 Y:2018 | 10 | 2018 | INSULATE BARE EQUIPMENT | $114 | $180 | Implemented |
WV0566 # 02 Y:2018 | 02 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $4,621 | $945 | Implemented |
WV0566 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,255 | $600 | Implemented |
WV0566 # 09 Y:2018 | 09 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $595 | $50 | Implemented |
WV0566 # 07 Y:2018 | 07 | 2018 | MINIMIZE WATER USAGE | $1,217 | $3,150 | Implemented |
WV0566 # 04 Y:2018 | 04 | 2018 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,029 | $500 | Implemented |
WV0566 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,581 | $575 | Implemented |
WV0563 # 06 Y:2018 | 06 | 2018 | MINIMIZE WATER USAGE | $1,202 | $1,400 | Implemented |
WV0563 # 07 Y:2018 | 07 | 2018 | INSULATE BARE EQUIPMENT | $264 | $235 | Implemented |
WV0563 # 04 Y:2018 | 04 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $20,002 | $754 | Implemented |
UD0971 # 01 Y:2017 | 01 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,580 | $0 | Implemented |
UD0971 # 04 Y:2017 | 04 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $972 | $50 | Implemented |
WV0545 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,500 | $4,023 | Implemented |