Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
133
matching recommendationsSIC | 32 | Stone, Clay, And Glass Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1049 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,601 | $1,060 | Implemented |
OK1049 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $552 | $820 | Implemented |
OK1049 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,589 | $0 | Implemented |
OK1042 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,703 | $0 | Implemented |
OK0981 # 01 Y:2018 | 01 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $124,716 | $75,000 | Implemented |
OK0898 # 07 Y:2014 | 07 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $136 | $463 | Implemented |
OK0898 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,132 | $1,689 | Implemented |
OK0898 # 10 Y:2014 | 10 | 2014 | USE OPTIMUM THICKNESS INSULATION | $6,545 | $27,400 | Implemented |
OK0898 # 04 Y:2014 | 04 | 2014 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $303 | $270 | Implemented |
OK0839 # 09 Y:2013 | 09 | 2013 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $873 | $490 | Implemented |
OK0839 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,494 | $33,218 | Implemented |
OK0839 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,540 | $0 | Implemented |
OK0839 # 11 Y:2013 | 11 | 2013 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $32,511 | $25,606 | Implemented |
OK0839 # 07 Y:2013 | 07 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,708 | $5,684 | Implemented |
OK0839 # 01 Y:2013 | 01 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,514 | $27,500 | Implemented |
OK0839 # 13 Y:2013 | 13 | 2013 | OPTIMIZE PLANT POWER FACTOR | $12,090 | $11,638 | Implemented |
OK0839 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,395 | $1,750 | Implemented |
OK0769 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $788 | $1,922 | Implemented |
OK0769 # 05 Y:2008 | 05 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,911 | $4,475 | Implemented |
OK0717 # 04 Y:2005 | 04 | 2005 | INSULATE BARE EQUIPMENT | $1,466 | $1,039 | Implemented |
OK0717 # 05 Y:2005 | 05 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $1,002 | $9,712 | Implemented |
OK0717 # 01 Y:2005 | 01 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $38,551 | $53,370 | Implemented |
OK0641 # 07 Y:2002 | 07 | 2002 | USE OPTIMUM THICKNESS INSULATION | $194,258 | $42,750 | Implemented |
OK0635 # 11 Y:2002 | 11 | 2002 | INSTALL SET-BACK TIMERS | $149 | $312 | Implemented |
OK0635 # 07 Y:2002 | 07 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,070 | $200 | Implemented |