IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

725

matching recommendations
Reset
SIC 327 Concrete, Gypsum, And Plaster Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0713 # 05 Y:2018 05 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,108 $5,028 Implemented
OR0713 # 06 Y:2018 06 2018 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $929 $0 Implemented
AS0459 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,314 $280 Implemented
AS0459 # 04 Y:2018 04 2018 INSTALL TIMERS AND/OR THERMOSTATS $1,642 $3,200 Implemented
MA0776 # 03 Y:2017 03 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $973 $301 Implemented
MA0776 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,365 $15,725 Implemented
GT0898 # 02 Y:2017 02 2017 METER WASTE WATER $38,607 $18,000 Implemented
GT0898 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,648 $9,390 Implemented
MA0774 # 05 Y:2017 05 2017 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,908 $1,775 Implemented
MA0774 # 04 Y:2017 04 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $2,868 $652 Implemented
MA0774 # 01 Y:2017 01 2017 USE SOLAR HEAT FOR HEAT $58,825 $627,522 Implemented
AS0438 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,271 $100 Implemented
AS0438 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,583 $45,665 Implemented
AS0438 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $1,028 $329 Implemented
BS0086 # 03 Y:2016 03 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,887 $280 Implemented
BS0086 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,877 $1,280 Implemented
AM0713 # 05 Y:2016 05 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,460 $3,900 Implemented
AM0713 # 04 Y:2016 04 2016 USE SYNTHETIC LUBRICANT $4,600 $0 Implemented
AM0713 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,870 $16,220 Implemented
AM0713 # 02 Y:2016 02 2016 OPTIMIZE PLANT POWER FACTOR $58,650 $76,000 Implemented
MA0760 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,364 $500 Implemented
MA0760 # 02 Y:2016 02 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,981 $17,000 Implemented
BS0064 # 01 Y:2015 01 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,694 $503 Implemented
BS0064 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $98 $200 Implemented
BS0061 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $223 $702 Implemented