IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,500

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0184 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,667 $2,615 Implemented
IP0184 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,142 $12,019 Implemented
IP0184 # 01 Y:2023 01 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $14,493 $0 Implemented
IP0184 # 02 Y:2023 02 2023 USE MINIMUM STEAM OPERATING PRESSURE $83,429 $20,365 Implemented
IP0184 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,216 $17,960 Implemented
AS0565 # 07 Y:2023 07 2023 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $454 $720 Implemented
AS0565 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $583,260 $500 Implemented
WM0207 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,225 $1,100 Implemented
WM0207 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,028 $12,825 Implemented
WM0207 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,619 $4,084 Implemented
AS0565 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $139,376 $1,265,613 Implemented
AS0565 # 05 Y:2023 05 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $1,336 $75 Implemented
SD0643 # 04 Y:2024 04 2024 USE OPTIMUM TEMPERATURE $6,846 $0 Implemented
SD0643 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $338 $424 Implemented
SD0643 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $489 $250 Implemented
UW2316 # 02 Y:2023 02 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $73,471 $88,000 Implemented
UW2316 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $705 $2,080 Implemented
OR0776 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $1,131 $6,802 Implemented
UD1065 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,046 $952 Implemented
UD1065 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,980 $2,457 Implemented
DL0225 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,072 $500 Implemented
DL0225 # 01 Y:2023 01 2023 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,327 $0 Implemented
DL0225 # 02 Y:2023 02 2023 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,327 $0 Implemented
DL0225 # 07 Y:2023 07 2023 IMPROVE HANDLING PRACTICES $25,825 $10,000 Implemented
DL0225 # 08 Y:2023 08 2023 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,068 $28,750 Implemented