IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

305

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0643 # 04 Y:2024 04 2024 USE OPTIMUM TEMPERATURE $6,846 $0 Implemented
SD0643 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $338 $424 Implemented
SD0643 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $489 $250 Implemented
SD0635 # 04 Y:2023 04 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,128 $51,000 Implemented
SD0635 # 08 Y:2023 08 2023 REPAIR AND ELIMINATE STEAM LEAKS $5,330 $3,125 Implemented
SD0635 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,458 $1,000 Implemented
SD0635 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $77,202 $252,463 Implemented
SD0635 # 09 Y:2023 09 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,894 $3,900 Implemented
SD0635 # 06 Y:2023 06 2023 ADJUST BURNERS FOR EFFICIENT OPERATION $10,368 $0 Implemented
SD0635 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $541 $1,832 Implemented
SD0624 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,290 $1,500 Implemented
SD0624 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,070 $828 Implemented
SD0624 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,715 $1,161 Implemented
SF0586 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $1,974 $4,260 Implemented
SF0586 # 05 Y:2022 05 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $35,916 $68,135 Implemented
SF0586 # 03 Y:2022 03 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $38,078 $22,361 Implemented
SF0586 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,887 $0 Implemented
SF0586 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,736 $14,830 Implemented
SF0586 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,428 $26,487 Implemented
SF0586 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,868 $0 Implemented
SF0586 # 08 Y:2022 08 2022 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $62,090 $317,631 Implemented
SF0584 # 01 Y:2022 01 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,346 $2,177 Implemented
SF0584 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,882 $13,939 Implemented
SD0579 # 03 Y:2019 03 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,229 $21,116 Implemented
SD0579 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,727 $0 Implemented