IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0206 # 07 Y:2022 07 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,868 $1,019 Implemented
UU0206 # 05 Y:2022 05 2022 MINIMIZE WATER USAGE $5,292 $1,764 Implemented
UU0206 # 04 Y:2022 04 2022 PAY UTILITY BILLS ON TIME $23,515 $750 Implemented
UU0206 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $139,892 $110,800 Implemented
UU0206 # 02 Y:2022 02 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $79,430 $1,500 Implemented
UU0206 # 03 Y:2022 03 2022 MODIFY STARTUP/SHUTDOWN TIMES $15,730 $3,713 Implemented
UU0196 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $779 $750 Implemented
UU0196 # 06 Y:2022 06 2022 INSTALL TIMERS AND/OR THERMOSTATS $510 $640 Implemented
UU0196 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,096 $323 Implemented
UU0196 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $1,732 $7,647 Implemented
UU0196 # 01 Y:2022 01 2022 CHECK FOR ACCURACY OF UTILITY / POWER METERS $10,923 $250 Implemented
UU0177 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,105 $11,650 Implemented
UU0177 # 09 Y:2021 09 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,497 $100 Implemented
UU0177 # 08 Y:2021 08 2021 REDUCE VENTILATION AIR $4,129 $4,000 Implemented
UU0177 # 02 Y:2021 02 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $36,240 $6,760 Implemented
UU0177 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,515 $5,046 Implemented
UU0177 # 05 Y:2021 05 2021 OPTIMIZE PLANT POWER FACTOR $10,455 $14,250 Implemented
UU0173 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $5,743 $3,188 Implemented
UU0173 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,755 $8,095 Implemented
UU0173 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,018 $474 Implemented
UU0120 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,587 $61,481 Implemented
UU0120 # 04 Y:2017 04 2017 UPGRADE CONTROLS ON COMPRESSORS $12,184 $800 Implemented
UU0120 # 05 Y:2017 05 2017 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $6,334 $400 Implemented
UU0120 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,227 $410 Implemented
UU0120 # 07 Y:2017 07 2017 INSTALL COMMON HEADER ON COMPRESSORS $4,024 $5,000 Implemented