IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0197 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,789 $1,875 Implemented
WM0197 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $14,680 $41,043 Implemented
WM0197 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,111 $870 Implemented
WM0151 # 06 Y:2019 06 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,501 $500 Implemented
WM0151 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,432 $3,450 Implemented
WM0064 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,497 $1,640 Implemented
WM0064 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,641 $8,621 Implemented
WI0499 # 07 Y:2005 07 2005 INSTALL SPECTRAL REFLECTORS / DELAMP $344 $0 Implemented
WI0499 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $967 $1,280 Implemented
WI0499 # 05 Y:2005 05 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,285 $300 Implemented
WI0499 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,192 $22,500 Implemented
WI0499 # 02 Y:2005 02 2005 INSTALL TIMERS AND/OR THERMOSTATS $9,925 $600 Implemented
WI0499 # 01 Y:2005 01 2005 MODIFY WORKLOAD $42,000 $3,600 Implemented
IC0094 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,623 $3,900 Implemented
IC0094 # 03 Y:2005 03 2005 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $24,437 $32,056 Implemented
WI0476 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,557 $4,280 Implemented
WI0476 # 06 Y:2004 06 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,148 $0 Implemented
WI0476 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,141 $640 Implemented
WI0421 # 04 Y:2002 04 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,940 $500 Implemented
WI0421 # 03 Y:2002 03 2002 INSTALL TIMERS AND/OR THERMOSTATS $4,470 $600 Implemented
WI0266 # 08 Y:1996 08 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $440 $0 Implemented
WI0266 # 07 Y:1996 07 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,546 $1,220 Implemented
WI0266 # 06 Y:1996 06 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $150 $250 Implemented
WI0266 # 05 Y:1996 05 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,072 $1,800 Implemented
WI0266 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,572 $1,280 Implemented