IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0120 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,459 $600 Implemented
BD0120 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,816 $11,230 Implemented
AR0146 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,398 $1,340 Implemented
AR0146 # 08 Y:1998 08 1998 $98,162 $386,400 Implemented
AR0146 # 07 Y:1998 07 1998 $3,780 $0 Implemented
AR0146 # 05 Y:1998 05 1998 REDUCE OR ELIMINATE WASTE $224,855 $8,100 Implemented
AR0146 # 03 Y:1998 03 1998 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $29,234 $18,900 Implemented
AR0146 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,850 $300 Implemented
AR0146 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,771 $840 Implemented
UD0554 # 07 Y:1998 07 1998 COVER OPEN TANKS $2,023 $1,050 Implemented
UD0554 # 05 Y:1998 05 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $4,026 $1,850 Implemented
UD0554 # 03 Y:1998 03 1998 $28,560 $8,000 Implemented
DS0118 # 02 Y:1998 02 1998 OPTIMIZE PLANT POWER FACTOR $610 $600 Implemented
DS0118 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,578 $5,326 Implemented
NC0140 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $489 $852 Implemented
NC0140 # 09 Y:1998 09 1998 $237,500 $12,000 Implemented
NC0140 # 05 Y:1998 05 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $1,555 $200 Implemented
NC0140 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $4,227 $1,090 Implemented
OD0110 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,812 $8,363 Implemented
OD0110 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,397 $605 Implemented
OD0110 # 04 Y:1998 04 1998 REDUCE VENTILATION AIR $1,460 $1,100 Implemented
OD0110 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,307 $10,032 Implemented
TN0637 # 02 Y:1998 02 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $248,625 $0 Implemented
TN0637 # 03 Y:1998 03 1998 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $48,770 $9,300 Implemented
TN0637 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,860 $1,000 Implemented