IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

116

matching recommendations
Reset
SIC 3316 Cold Finishing Of Steel Shapes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0668 # 08 Y:2024 08 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $452 $1,500 Implemented
WV0668 # 10 Y:2024 10 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $113 $152 Implemented
WV0668 # 09 Y:2024 09 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $239 $824 Implemented
WV0668 # 04 Y:2024 04 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,250 $773 Implemented
WV0668 # 06 Y:2024 06 2024 UPGRADE CONTROLS ON COMPRESSORS $865 $2,110 Implemented
WV0668 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $949 $540 Implemented
WV0668 # 07 Y:2024 07 2024 DEVELOP A REPAIR/REPLACE POLICY $518 $2,243 Implemented
UD0946 # 07 Y:2016 07 2016 DEVELOP A REPAIR/REPLACE POLICY $462 $2,400 Implemented
UD0946 # 01 Y:2016 01 2016 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,504 $500 Implemented
UD0946 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $304 $0 Implemented
SD0454 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $14,303 $13,546 Implemented
SD0454 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,236 $2,700 Implemented
SD0454 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,512 $200 Implemented
LE0332 # 07 Y:2012 07 2012 DEVELOP STANDARD OPERATING PROCEDURES $6,689 $0 Implemented
LE0332 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,829 $40 Implemented
MA0676 # 05 Y:2011 05 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $593 $1,250 Implemented
MA0676 # 01 Y:2011 01 2011 OPTIMIZE PLANT POWER FACTOR $204,367 $98,845 Implemented
MA0676 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $1,721 $2,750 Implemented
MA0635 # 05 Y:2008 05 2008 BURN A LESS EXPENSIVE GRADE OF FUEL $16,990 $27,590 Implemented
MA0635 # 01 Y:2008 01 2008 USE MINIMUM SAFE OVEN VENTILATION $17,227 $51,900 Implemented
MA0635 # 04 Y:2008 04 2008 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $18,922 $4,000 Implemented
MA0635 # 03 Y:2008 03 2008 REDUCE VENTILATION AIR $21,303 $8,200 Implemented
MA0635 # 06 Y:2008 06 2008 COVER OPEN TANKS $13,756 $53,000 Implemented
MA0635 # 07 Y:2008 07 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $10,446 $3,288 Implemented
MA0635 # 12 Y:2008 12 2008 USE MINIMUM SAFE OVEN VENTILATION $880 $500 Implemented