IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0538 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,238 $85 Implemented
MA0538 # 04 Y:2003 04 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,650 $60,800 Implemented
MA0538 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $31,418 $1,200 Implemented
MA0498 # 08 Y:2001 08 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $228 $45 Implemented
MA0498 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,132 $25,540 Implemented
MA0498 # 05 Y:2001 05 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,300 $13,000 Implemented
MA0498 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,980 $0 Implemented
MA0498 # 02 Y:2001 02 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $10,867 $0 Implemented
MA0498 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,844 $60,000 Implemented
MA0416 # 03 Y:1998 03 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,884 $1,000 Implemented
MA0416 # 04 Y:1998 04 1998 INSTALL OCCUPANCY SENSORS $243 $472 Implemented
MA0416 # 02 Y:1998 02 1998 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) $13,356 $2,000 Implemented
MA0416 # 01 Y:1998 01 1998 ELIMINATE SHIFT $145,100 $250,000 Implemented
MA0404 # 05 Y:1997 05 1997 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $0 $0 Implemented
MA0404 # 03 Y:1997 03 1997 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $12,933 $71,400 Implemented
MA0404 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $412,115 $1,000,000 Implemented
MA0043 # 06 Y:1985 06 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,590 $500 Implemented
MA0047 # 05 Y:1985 05 1985 INSTALL TIMERS AND/OR THERMOSTATS $3,640 $2,000 Implemented
MA0047 # 04 Y:1985 04 1985 REPAIR OR REPLACE STEAM TRAPS $16,278 $715 Implemented
MA0047 # 03 Y:1985 03 1985 HEAT WATER WITH EXHAUST HEAT $1,144 $2,804 Implemented
MA0047 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,175 $821 Implemented
MA0047 # 01 Y:1985 01 1985 UPGRADE OBSOLETE EQUIPMENT $11,304 $0 Implemented