IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
SIC 3339 Primary Nonferrous Metals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0062 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,392 $60 Implemented
SF0349 # 12 Y:2007 12 2007 USE PHOTOCELL CONTROLS $3,302 $9,569 Implemented
SF0349 # 10 Y:2007 10 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,554 $4,281 Implemented
SF0349 # 06 Y:2007 06 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $725 $757 Implemented
SF0349 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $3,490 $1,992 Implemented
SF0349 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,755 $0 Implemented
SF0349 # 01 Y:2007 01 2007 REPAIR AND ELIMINATE STEAM LEAKS $6,853 $0 Implemented
SF0341 # 04 Y:2007 04 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,392 $919 Implemented
SF0341 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,716 $0 Implemented
SF0341 # 13 Y:2007 13 2007 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $17,456 $0 Implemented
SF0341 # 11 Y:2007 11 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,983 $19,920 Implemented
SF0341 # 09 Y:2007 09 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $51,342 $60,000 Implemented
SF0341 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,585 $1,620 Implemented
SF0341 # 07 Y:2007 07 2007 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $20,686 $15,000 Implemented
SF0341 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,960 $9,373 Implemented
SF0341 # 03 Y:2007 03 2007 REPAIR AND ELIMINATE STEAM LEAKS $529 $0 Implemented
UU0026 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,573 $0 Implemented
OR0251 # 01 Y:1995 01 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $69,966 $115,000 Implemented
OR0251 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,007 $9,588 Implemented
UM0022 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $540 $367 Implemented
UM0022 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,344 $4,614 Implemented
UM0022 # 03 Y:1995 03 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $31,536 $250 Implemented
AS0115 # 05 Y:1994 05 1994 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $4,051 $7,317 Implemented
AS0115 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,197 $7,621 Implemented
AS0115 # 01 Y:1994 01 1994 USE SYNTHETIC LUBRICANT $547 $1,774 Implemented