Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
63
matching recommendationsSIC | 3339 | Primary Nonferrous Metals, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0062 # 01 Y:2011 | 01 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,392 | $60 | Implemented |
SF0349 # 12 Y:2007 | 12 | 2007 | USE PHOTOCELL CONTROLS | $3,302 | $9,569 | Implemented |
SF0349 # 10 Y:2007 | 10 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,554 | $4,281 | Implemented |
SF0349 # 06 Y:2007 | 06 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $725 | $757 | Implemented |
SF0349 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $3,490 | $1,992 | Implemented |
SF0349 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,755 | $0 | Implemented |
SF0349 # 01 Y:2007 | 01 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $6,853 | $0 | Implemented |
SF0341 # 04 Y:2007 | 04 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,392 | $919 | Implemented |
SF0341 # 01 Y:2007 | 01 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,716 | $0 | Implemented |
SF0341 # 13 Y:2007 | 13 | 2007 | REUSE / RECYCLE/ SELL RUBBER PRODUCTS | $17,456 | $0 | Implemented |
SF0341 # 11 Y:2007 | 11 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,983 | $19,920 | Implemented |
SF0341 # 09 Y:2007 | 09 | 2007 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $51,342 | $60,000 | Implemented |
SF0341 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,585 | $1,620 | Implemented |
SF0341 # 07 Y:2007 | 07 | 2007 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $20,686 | $15,000 | Implemented |
SF0341 # 06 Y:2007 | 06 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,960 | $9,373 | Implemented |
SF0341 # 03 Y:2007 | 03 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $529 | $0 | Implemented |
UU0026 # 03 Y:2002 | 03 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,573 | $0 | Implemented |
OR0251 # 01 Y:1995 | 01 | 1995 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $69,966 | $115,000 | Implemented |
OR0251 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,007 | $9,588 | Implemented |
UM0022 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $540 | $367 | Implemented |
UM0022 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,344 | $4,614 | Implemented |
UM0022 # 03 Y:1995 | 03 | 1995 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $31,536 | $250 | Implemented |
AS0115 # 05 Y:1994 | 05 | 1994 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $4,051 | $7,317 | Implemented |
AS0115 # 02 Y:1994 | 02 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,197 | $7,621 | Implemented |
AS0115 # 01 Y:1994 | 01 | 1994 | USE SYNTHETIC LUBRICANT | $547 | $1,774 | Implemented |