IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

202

matching recommendations
Reset
SIC 3341 Secondary Nonferrous Metals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0584 # 01 Y:2022 01 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,346 $2,177 Implemented
SF0584 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,882 $13,939 Implemented
TT0242 # 01 Y:2020 01 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,906,442 $4,500,000 Implemented
UA0209 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $72,891 $2,850 Implemented
UA0209 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,697 $3,007 Implemented
UA0209 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,815 $10,528 Implemented
WV0506 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,457 $7,450 Implemented
WV0506 # 09 Y:2015 09 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,221 $1,000 Implemented
WV0506 # 10 Y:2015 10 2015 DEVELOP A REPAIR/REPLACE POLICY $790 $1,205 Implemented
WV0506 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,853 $7,076 Implemented
WV0506 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,579 $270 Implemented
UA0115 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,145 $2,595 Implemented
UA0115 # 06 Y:2014 06 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $3,192 $1,920 Implemented
UA0115 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,820 $800 Implemented
UD0888 # 04 Y:2013 04 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,510 $5,000 Implemented
UD0888 # 12 Y:2013 12 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $20,092 $0 Implemented
UD0888 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $7,011 $0 Implemented
UD0888 # 20 Y:2013 20 2013 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $412 $0 Implemented
UK1313 # 03 Y:2013 03 2013 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $23,080 $10,000 Implemented
UK1313 # 04 Y:2013 04 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,510 $5,000 Implemented
UD0888 # 11 Y:2013 11 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,284 $15,000 Implemented
UK1313 # 02 Y:2013 02 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $841 $0 Implemented
UK1313 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $7,011 $0 Implemented
UD0888 # 21 Y:2013 21 2013 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $4,400 $0 Implemented
UD0888 # 08 Y:2013 08 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,313 $0 Implemented