Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
865
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0314 # 09 Y:2001 | 09 | 2001 | CLEAR AND RENT EXISTING SPACE | $38,822 | $4,156 | Implemented |
UM0200 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,418 | $2,000 | Implemented |
UM0200 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,869 | $750 | Implemented |
OK0616 # 02 Y:2001 | 02 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,570 | $1,040 | Implemented |
OK0616 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $17,387 | $4,428 | Implemented |
OK0616 # 10 Y:2001 | 10 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $540,000 | $125,040 | Implemented |
UU0010 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,308 | $9,973 | Implemented |
UU0010 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,643 | $75 | Implemented |
UU0010 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,495 | $680 | Implemented |
UU0010 # 05 Y:2001 | 05 | 2001 | USE SYNTHETIC LUBRICANT | $761 | $600 | Implemented |
WV0226 # 01 Y:2001 | 01 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,373 | $0 | Implemented |
WV0226 # 02 Y:2001 | 02 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,673 | $1,100 | Implemented |
WV0226 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $4,794 | $1,008 | Implemented |
WV0226 # 04 Y:2001 | 04 | 2001 | INSULATE BARE EQUIPMENT | $2,882 | $336 | Implemented |
WV0226 # 08 Y:2001 | 08 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,542 | $100 | Implemented |
WV0226 # 10 Y:2001 | 10 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,863 | $1,200 | Implemented |
WV0226 # 12 Y:2001 | 12 | 2001 | ADVERTISE PRODUCT OR SERVICE | $312,500 | $2,000 | Implemented |
SU0117 # 02 Y:2001 | 02 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $768 | $0 | Implemented |
SU0117 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,845 | $158 | Implemented |
SU0117 # 07 Y:2001 | 07 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,888 | $20,600 | Implemented |
MI0017 # 01 Y:2001 | 01 | 2001 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $91,260 | $30 | Implemented |
MI0017 # 03 Y:2001 | 03 | 2001 | ELIMINATE/REDUCE AN OPERATION | $6,170 | $120 | Implemented |
MI0017 # 04 Y:2001 | 04 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $20,783 | $13 | Implemented |
MI0017 # 05 Y:2001 | 05 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,778 | $520 | Implemented |
MI0017 # 06 Y:2001 | 06 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,964 | $520 | Implemented |