IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0967 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $968 $576 Implemented
GT0967 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,800 $1,000 Implemented
GT0967 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,377 $1,850 Implemented
GT0967 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $23,763 $800 Implemented
GT0848 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,088 $0 Implemented
GT0848 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,718 $3,250 Implemented
GT0848 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $340 $1,000 Implemented
GT0815 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,456 $39,000 Implemented
GT0815 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,229 $69,592 Implemented
GT0815 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,800 $12,500 Implemented
GT0815 # 06 Y:2005 06 2005 USE SYNTHETIC LUBRICANT $4,865 $0 Implemented
GT0715 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,725 $28,875 Implemented
GT0715 # 07 Y:2001 07 2001 USE LESS WASTEFUL PACKAGING $1,754 $0 Implemented
GT0715 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,380 $0 Implemented
GT0681 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $12,917 $4,800 Implemented
GT0668 # 01 Y:1999 01 1999 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $3,706 $0 Implemented
GT0668 # 08 Y:1999 08 1999 DEVELOP STANDARD OPERATING PROCEDURES $1,449,000 $234,000 Implemented
GT0668 # 05 Y:1999 05 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,662 $345 Implemented
GT0668 # 04 Y:1999 04 1999 INSTALL TIMERS AND/OR THERMOSTATS $678 $1,000 Implemented
GT0674 # 07 Y:1999 07 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $419 $100 Implemented
GT0674 # 06 Y:1999 06 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,892 $14,981 Implemented
GT0674 # 03 Y:1999 03 1999 REPAIR AND ELIMINATE STEAM LEAKS $4,037 $400 Implemented
GT0411 # 01 Y:1990 01 1990 INSTALL SET-BACK TIMERS $3,510 $0 Implemented
GT0411 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $393 $48 Implemented
GT0411 # 03 Y:1990 03 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $914 $0 Implemented