IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0458 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $229,273 $13,000 Implemented
AS0314 # 07 Y:2001 07 2001 $11,340 $1,262 Implemented
AS0314 # 06 Y:2001 06 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $142 $50 Implemented
AS0314 # 09 Y:2001 09 2001 $38,822 $4,156 Implemented
AS0314 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $538 $30 Implemented
AS0314 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,375 $112 Implemented
AS0314 # 08 Y:2001 08 2001 $1,055 $40 Implemented
AS0314 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $256 $751 Implemented
AS0314 # 01 Y:2001 01 2001 INSTALL SKYLIGHTS $474 $996 Implemented
AS0293 # 01 Y:2001 01 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,069 $2,460 Implemented
AS0292 # 01 Y:2001 01 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,245 $540 Implemented
AS0229 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,979 $200 Implemented
AS0229 # 10 Y:1998 10 1998 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $859 $150 Implemented
AS0229 # 09 Y:1998 09 1998 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,718 $450 Implemented
AS0229 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $352 $435 Implemented
AS0229 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,030 $56,554 Implemented
AS0122 # 10 Y:1994 10 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $314 $220 Implemented
AS0122 # 08 Y:1994 08 1994 DISCONNECT BALLASTS $242 $200 Implemented
AS0122 # 07 Y:1994 07 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,565 $5,200 Implemented
AS0122 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,242 $400 Implemented
AS0122 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,094 $0 Implemented
AS0122 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,856 $4,686 Implemented
AS0105 # 09 Y:1993 09 1993 INSULATE BARE EQUIPMENT $1,707 $820 Implemented
AS0105 # 06 Y:1993 06 1993 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,746 $0 Implemented
AS0105 # 04 Y:1993 04 1993 USE SYNTHETIC LUBRICANT $623 $1,230 Implemented