IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

120

matching recommendations
Reset
SIC 3351 Copper Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0281 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,478 $1,400 Implemented
UM0163 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,248 $0 Implemented
UM0163 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,496 $500 Implemented
UM0163 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,147 $300 Implemented
UM0163 # 09 Y:2000 09 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $56,997 $90,000 Implemented
GT0668 # 01 Y:1999 01 1999 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $3,706 $0 Implemented
GT0668 # 04 Y:1999 04 1999 INSTALL TIMERS AND/OR THERMOSTATS $678 $1,000 Implemented
GT0668 # 05 Y:1999 05 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,662 $345 Implemented
GT0668 # 08 Y:1999 08 1999 DEVELOP STANDARD OPERATING PROCEDURES $1,449,000 $234,000 Implemented
MS0059 # 02 Y:1996 02 1996 ADJUST BURNERS FOR EFFICIENT OPERATION $26,347 $1,000 Implemented
UM0037 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $771 $2,786 Implemented
MA0322 # 02 Y:1995 02 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $20,120 $1,500 Implemented
MA0322 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,158 $2,200 Implemented
MA0322 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,082 $17,946 Implemented
MA0322 # 07 Y:1995 07 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $384 $945 Implemented
MA0322 # 08 Y:1995 08 1995 USE OTHER WASTE CONCENTRATION METHODS $61,150 $85,000 Implemented
WV0041 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,160 $584 Implemented
AM0189 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,300 $1,500 Implemented
AM0189 # 03 Y:1993 03 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,540 $70 Implemented
AM0189 # 04 Y:1993 04 1993 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,760 $0 Implemented
AM0189 # 05 Y:1993 05 1993 PAY UTILITY BILLS ON TIME $540 $0 Implemented
MA0233 # 01 Y:1992 01 1992 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $28,770 $2,000 Implemented
MA0233 # 03 Y:1992 03 1992 INSULATE BARE EQUIPMENT $10,672 $12,412 Implemented
MA0233 # 04 Y:1992 04 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,341 $14,210 Implemented
MA0233 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,334 $8,000 Implemented