Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 3354 | Aluminum Extruded Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0458 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $229,273 | $13,000 | Implemented |
AS0314 # 09 Y:2001 | 09 | 2001 | CLEAR AND RENT EXISTING SPACE | $38,822 | $4,156 | Implemented |
AS0314 # 08 Y:2001 | 08 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $1,055 | $40 | Implemented |
AS0314 # 07 Y:2001 | 07 | 2001 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $11,340 | $1,262 | Implemented |
AS0314 # 06 Y:2001 | 06 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $142 | $50 | Implemented |
AS0314 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $538 | $30 | Implemented |
AS0314 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,375 | $112 | Implemented |
AS0314 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $256 | $751 | Implemented |
AS0314 # 01 Y:2001 | 01 | 2001 | INSTALL SKYLIGHTS | $474 | $996 | Implemented |
AS0293 # 01 Y:2001 | 01 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $5,069 | $2,460 | Implemented |
AS0292 # 01 Y:2001 | 01 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,245 | $540 | Implemented |
AS0229 # 10 Y:1998 | 10 | 1998 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $859 | $150 | Implemented |
AS0229 # 09 Y:1998 | 09 | 1998 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,718 | $450 | Implemented |
AS0229 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $352 | $435 | Implemented |
AS0229 # 03 Y:1998 | 03 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,030 | $56,554 | Implemented |
AS0229 # 02 Y:1998 | 02 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,979 | $200 | Implemented |
AS0105 # 02 Y:1993 | 02 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $75 | $147 | Implemented |
AS0105 # 10 Y:1993 | 10 | 1993 | COVER OPEN TANKS | $5,556 | $0 | Implemented |
AS0105 # 09 Y:1993 | 09 | 1993 | INSULATE BARE EQUIPMENT | $1,707 | $820 | Implemented |
AS0105 # 06 Y:1993 | 06 | 1993 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $1,746 | $0 | Implemented |
AS0105 # 05 Y:1993 | 05 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,244 | $350 | Implemented |
AS0105 # 04 Y:1993 | 04 | 1993 | USE SYNTHETIC LUBRICANT | $623 | $1,230 | Implemented |
AS0105 # 03 Y:1993 | 03 | 1993 | INSTALL OCCUPANCY SENSORS | $546 | $900 | Implemented |