Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,079
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0142 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $416 | $450 | Implemented |
UM0142 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,691 | $1,250 | Implemented |
UM0142 # 03 Y:1999 | 03 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $39 | $0 | Implemented |
UM0142 # 06 Y:1999 | 06 | 1999 | OPTIMIZE PLANT POWER FACTOR | $7,489 | $10,860 | Implemented |
UM0142 # 07 Y:1999 | 07 | 1999 | METER WASTE WATER | $6,412 | $500 | Implemented |
UD0573 # 01 Y:1999 | 01 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $238,622 | $0 | Implemented |
UD0573 # 02 Y:1999 | 02 | 1999 | RECYCLE CASTING SAND | $159,120 | $310,000 | Implemented |
UD0573 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,523 | $14,669 | Implemented |
DS0141 # 01 Y:1999 | 01 | 1999 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $10,285 | $24,040 | Implemented |
DS0141 # 02 Y:1999 | 02 | 1999 | OPTIMIZE PLANT POWER FACTOR | $4,260 | $4,500 | Implemented |
DS0141 # 03 Y:1999 | 03 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,031 | $700 | Implemented |
DS0141 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,348 | $900 | Implemented |
DS0141 # 05 Y:1999 | 05 | 1999 | UPGRADE OBSOLETE EQUIPMENT | $13,679 | $32,000 | Implemented |
DS0141 # 06 Y:1999 | 06 | 1999 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,184 | $1,200 | Implemented |
UM0137 # 01 Y:1999 | 01 | 1999 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $420 | $0 | Implemented |
UM0137 # 02 Y:1999 | 02 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,358 | $40,000 | Implemented |
UM0137 # 03 Y:1999 | 03 | 1999 | IMPROVE SPACE COMFORT CONDITIONING | $4,047 | $16,100 | Implemented |
WI0343 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,468 | $60 | Implemented |
UD0564 # 02 Y:1999 | 02 | 1999 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $22,972 | $148 | Implemented |
UD0564 # 04 Y:1999 | 04 | 1999 | COVER OPEN TANKS | $13,847 | $2,400 | Implemented |
UD0564 # 05 Y:1999 | 05 | 1999 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $10,689 | $0 | Implemented |
UD0564 # 07 Y:1999 | 07 | 1999 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,767 | $3,375 | Implemented |
MA0419 # 01 Y:1998 | 01 | 1998 | COVER OPEN TANKS | $168,295 | $5,000 | Implemented |
MA0419 # 02 Y:1998 | 02 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $54,360 | $118,235 | Implemented |
MA0419 # 04 Y:1998 | 04 | 1998 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $10,000 | $3,120 | Implemented |