IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0194 # 09 Y:2023 09 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $9,970 $2,832 Implemented
WM0194 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,924 $39,795 Implemented
WM0194 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $35,203 $110,000 Implemented
WM0194 # 04 Y:2023 04 2023 PAY BILLS ON TIME TO AVOID LATE FEES $41,818 $0 Implemented
WM0189 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $683 $2,500 Implemented
WM0189 # 06 Y:2023 06 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $873 $5,496 Implemented
WM0189 # 04 Y:2023 04 2023 COMBINE UTILITY METERS $2,274 $0 Implemented
WM0189 # 03 Y:2023 03 2023 IMPROVE COMBUSTION CONTROL CAPABILITY $4,948 $15,600 Implemented
WM0110 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $38,561 $90,000 Implemented
WM0110 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,832 $23,000 Implemented
WM0081 # 08 Y:2016 08 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,981 $2,000 Implemented
WM0081 # 05 Y:2016 05 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $8,381 $1,000 Implemented
WM0052 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $391 $375 Implemented
WM0052 # 04 Y:2014 04 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,464 $602 Implemented
WM0026 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,054 $33,056 Implemented
WM0026 # 04 Y:2013 04 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,454 $1,526 Implemented
WI0519 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,324 $1,920 Implemented
WI0519 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,299 $0 Implemented
WI0519 # 02 Y:2006 02 2006 $30,000 $1,800 Implemented
WI0432 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $957 $356 Implemented
WI0432 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,052 $150 Implemented
WI0432 # 01 Y:2002 01 2002 RECOVER AND REUSE WASTE MATERIAL $16,280 $8,000 Implemented
WI0343 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,468 $60 Implemented
WI0225 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $2,110 $1,365 Implemented
WI0225 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,909 $1,280 Implemented