IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

459

matching recommendations
Reset
SIC 339 Miscellaneous Primary Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0005 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,410 $9,428 Implemented
UM0005 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $986 $600 Implemented
UM0005 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $561 $200 Implemented
UM0005 # 07 Y:1994 07 1994 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $17,300 $6,600 Implemented
UM0005 # 08 Y:1994 08 1994 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $40,230 $34,000 Implemented
ME0123 # 01 Y:1994 01 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,352 $500 Implemented
ME0123 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,038 $1,500 Implemented
MA0283 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,690 $435 Implemented
MA0283 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $3,380 $6,000 Implemented
MA0283 # 03 Y:1993 03 1993 RECOVER AND REUSE COOLING WATER $1,407 $200 Implemented
MA0283 # 05 Y:1993 05 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $548 $151 Implemented
MA0283 # 06 Y:1993 06 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $371 $400 Implemented
NC0002 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $566 $522 Implemented
NC0002 # 03 Y:1993 03 1993 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,991 $1,209 Implemented
NC0002 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,206 $100 Implemented
SD0060 # 01 Y:1993 01 1993 COVER OPEN TANKS $1,443 $85 Implemented
SD0060 # 02 Y:1993 02 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,816 $10,500 Implemented
SD0060 # 10 Y:1993 10 1993 INSTALL TIMERS AND/OR THERMOSTATS $256 $300 Implemented
AS0066 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,219 $4,230 Implemented
AS0066 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,749 $0 Implemented
AS0066 # 03 Y:1992 03 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,062 $4,836 Implemented
AS0066 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,140 $7,221 Implemented
AS0066 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,921 $7,200 Implemented
AS0066 # 06 Y:1992 06 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,845 $0 Implemented
AS0066 # 07 Y:1992 07 1992 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $384 $800 Implemented