Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
407
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0148 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,826 | $2,464 | Implemented |
UM0148 # 04 Y:1999 | 04 | 1999 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $12,311 | $40,000 | Implemented |
ND0321 # 01 Y:1999 | 01 | 1999 | $103,932 | $0 | Implemented | |
ND0321 # 04 Y:1999 | 04 | 1999 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $1,555 | $7,050 | Implemented |
ND0321 # 05 Y:1999 | 05 | 1999 | OPTIMIZE PLANT POWER FACTOR | $2,989 | $12,575 | Implemented |
ND0321 # 08 Y:1999 | 08 | 1999 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $730 | $125 | Implemented |
ND0321 # 10 Y:1999 | 10 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $158 | $130 | Implemented |
UM0136 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,707 | $9,821 | Implemented |
UM0136 # 02 Y:1999 | 02 | 1999 | AIR CONDITION ONLY SPACE NECESSARY | $1,684 | $400 | Implemented |
UM0133 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,000 | $2,000 | Implemented |
UM0133 # 02 Y:1999 | 02 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $35,000 | $43,000 | Implemented |
UM0133 # 03 Y:1999 | 03 | 1999 | MINIMIZE WATER USAGE | $35,600 | $5,500 | Implemented |
UM0133 # 04 Y:1999 | 04 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $21,232 | $14,700 | Implemented |
UM0133 # 05 Y:1999 | 05 | 1999 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $259,748 | $13,300 | Implemented |
ND0318 # 11 Y:1999 | 11 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $280 | $180 | Implemented |
UM0120 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,860 | $1,000 | Implemented |
UM0120 # 03 Y:1998 | 03 | 1998 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,029 | $1,000 | Implemented |
UM0120 # 04 Y:1998 | 04 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,783 | $100 | Implemented |
UM0120 # 07 Y:1998 | 07 | 1998 | $1,440 | $518 | Implemented | |
UM0121 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,850 | $2,048 | Implemented |
UM0121 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $511 | $1,000 | Implemented |
UM0121 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $761 | $990 | Implemented |
UM0121 # 04 Y:1998 | 04 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $12,085 | $6,000 | Implemented |
UM0121 # 05 Y:1998 | 05 | 1998 | USE EVAPORATION TO CONCENTRATE MATERIAL | $8,359 | $12,000 | Implemented |
UM0121 # 07 Y:1998 | 07 | 1998 | $1,756 | $3,350 | Implemented |