Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,255
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0631 # 09 Y:2001 | 09 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,671 | $0 | Implemented |
UD0631 # 13 Y:2001 | 13 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $421 | $688 | Implemented |
WV0222 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $935 | $100 | Implemented |
WV0222 # 03 Y:2001 | 03 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,296 | $1,000 | Implemented |
WV0222 # 04 Y:2001 | 04 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,685 | $880 | Implemented |
WV0222 # 06 Y:2001 | 06 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $13,220 | $1,792 | Implemented |
WV0222 # 08 Y:2001 | 08 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,491 | $44 | Implemented |
WV0222 # 11 Y:2001 | 11 | 2001 | RECYCLE FLUORESCENT LAMPS | $3,390 | $352 | Implemented |
WV0222 # 12 Y:2001 | 12 | 2001 | $45,760 | $5,000 | Implemented | |
WV0222 # 13 Y:2001 | 13 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $15,000 | $332 | Implemented |
AS0305 # 05 Y:2001 | 05 | 2001 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $4,588 | $110 | Implemented |
AS0305 # 06 Y:2001 | 06 | 2001 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $14,000 | $1,360 | Implemented |
AS0305 # 07 Y:2001 | 07 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $63,963 | $6,820 | Implemented |
UD0630 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,607 | $720 | Implemented |
UD0630 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $11,232 | $5,000 | Implemented |
UD0630 # 03 Y:2001 | 03 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,449 | $560 | Implemented |
UD0630 # 05 Y:2001 | 05 | 2001 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,639 | $500 | Implemented |
UD0630 # 06 Y:2001 | 06 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,272 | $88 | Implemented |
UD0630 # 07 Y:2001 | 07 | 2001 | INSULATE BARE EQUIPMENT | $611 | $1,180 | Implemented |
AS0304 # 04 Y:2001 | 04 | 2001 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $5,488 | $648 | Implemented |
AS0304 # 05 Y:2001 | 05 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $64,704 | $8,580 | Implemented |
AS0304 # 08 Y:2001 | 08 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $19,493 | $294 | Implemented |
AS0304 # 09 Y:2001 | 09 | 2001 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $16,000 | $3,940 | Implemented |
MA0490 # 01 Y:2001 | 01 | 2001 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $7,248 | $0 | Implemented |
MA0490 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,500 | $390 | Implemented |