IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,255

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0194 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,107 $21,359 Implemented
IA0194 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,197 $4,877 Implemented
SD0201 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,033 $1,033 Implemented
SD0201 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,892 $6,734 Implemented
SD0201 # 03 Y:1998 03 1998 INSTALL TIMERS AND/OR THERMOSTATS $1,393 $300 Implemented
SD0201 # 04 Y:1998 04 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $13,056 $0 Implemented
SD0201 # 05 Y:1998 05 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $22,080 $0 Implemented
UF0203 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,287 $1,200 Implemented
UF0203 # 05 Y:1998 05 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,933 $11,000 Implemented
UF0203 # 07 Y:1998 07 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,277 $4,000 Implemented
UL0194 # 02 Y:1998 02 1998 RECOVER AND REUSE SPENT ACID BATHS $67,100 $32,500 Implemented
UL0194 # 03 Y:1998 03 1998 CONVERT TO AQUEOUS CLEANING $3,798 $4,160 Implemented
UL0194 # 04 Y:1998 04 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,200 $4,200 Implemented
HO0181 # 03 Y:1998 03 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $532 $325 Implemented
HO0181 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $1,232 $1,008 Implemented
HO0181 # 05 Y:1998 05 1998 INSULATE FEEDWATER TANK $227 $72 Implemented
HO0181 # 06 Y:1998 06 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,922 $250 Implemented
WI0324 # 02 Y:1998 02 1998 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $487 $0 Implemented
WI0324 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,054 $400 Implemented
WI0324 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $381 $90 Implemented
WI0324 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $372 $640 Implemented
AM0324 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $28,430 $104,000 Implemented
AM0324 # 02 Y:1998 02 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $21,000 $500 Implemented
AM0324 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,800 $1,500 Implemented
AM0324 # 08 Y:1998 08 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $820 $0 Implemented