IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,274

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0118 # 08 Y:1998 08 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $774 $350 Implemented
BD0118 # 10 Y:1998 10 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $501 $0 Implemented
BD0118 # 11 Y:1998 11 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $448 $450 Implemented
BD0118 # 12 Y:1998 12 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $374 $360 Implemented
ME0245 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,696 $0 Implemented
ME0245 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,163 $5,970 Implemented
ME0245 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,398 $400 Implemented
ME0245 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,127 $3,000 Implemented
ME0245 # 05 Y:1998 05 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,051 $2,000 Implemented
ME0245 # 06 Y:1998 06 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $895 $700 Implemented
ME0245 # 07 Y:1998 07 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $803 $900 Implemented
ME0245 # 10 Y:1998 10 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $443 $174 Implemented
AM0328 # 03 Y:1998 03 1998 OPTIMIZE PLANT POWER FACTOR $11,750 $0 Implemented
AM0328 # 07 Y:1998 07 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $500 Implemented
OR0319 # 01 Y:1998 01 1998 ELIMINATE SHIFT $200,000 $2,500 Implemented
OR0319 # 02 Y:1998 02 1998 SCHEDULE DELIVERIES ACCORDING TO DEMAND $32,660 $300,000 Implemented
OR0319 # 03 Y:1998 03 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $31,569 $931 Implemented
OR0319 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $833 $1,000 Implemented
OR0319 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $355 $1,750 Implemented
IA0194 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,107 $21,359 Implemented
IA0194 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,197 $4,877 Implemented
SD0201 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,033 $1,033 Implemented
SD0201 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,892 $6,734 Implemented
SD0201 # 03 Y:1998 03 1998 INSTALL TIMERS AND/OR THERMOSTATS $1,393 $300 Implemented
SD0201 # 04 Y:1998 04 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $13,056 $0 Implemented