IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,255

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0291 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,099 $360 Implemented
WI0291 # 06 Y:1997 06 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $1,693 $0 Implemented
DS0082 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,969 $44,572 Implemented
DS0082 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $2,060 $1,230 Implemented
DS0082 # 04 Y:1997 04 1997 MINIMIZE WATER USAGE $2,363 $2,200 Implemented
DS0082 # 07 Y:1997 07 1997 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $29,490 $10,700 Implemented
TN0603 # 01 Y:1997 01 1997 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $31,860 $12,660 Implemented
TN0603 # 02 Y:1997 02 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $31,200 $21,000 Implemented
TN0603 # 08 Y:1997 08 1997 USE A RAG RECYCLE SERVICE $455 $0 Implemented
TN0603 # 09 Y:1997 09 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $120 $150 Implemented
HO0148 # 01 Y:1997 01 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,488 $2,196 Implemented
HO0148 # 02 Y:1997 02 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,600 $250 Implemented
HO0148 # 03 Y:1997 03 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $9,425 $5,000 Implemented
HO0148 # 06 Y:1997 06 1997 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $10,000 $10,000 Implemented
HO0148 # 07 Y:1997 07 1997 APPLY FOR INVESTMENT INCENTIVES $8,676 $100 Implemented
HO0147 # 02 Y:1997 02 1997 INSULATE BARE EQUIPMENT $1,474 $2,500 Implemented
SF0109 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $455 $516 Implemented
SF0109 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,043 $0 Implemented
SF0109 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,131 $20,040 Implemented
SF0109 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $390 $250 Implemented
SF0109 # 08 Y:1997 08 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $997 $0 Implemented
HO0146 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $616 $500 Implemented
HO0146 # 04 Y:1997 04 1997 INSULATE BARE EQUIPMENT $16,827 $7,700 Implemented
HO0146 # 06 Y:1997 06 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $104,000 $0 Implemented
HO0146 # 07 Y:1997 07 1997 RECOVER AND REUSE WASTE MATERIAL $53,760 $0 Implemented