IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0597 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,394 $2,625 Implemented
WV0597 # 05 Y:2020 05 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,072 $1,700 Implemented
WV0597 # 07 Y:2020 07 2020 DEVELOP A REPAIR/REPLACE POLICY $1,940 $444 Implemented
WV0597 # 09 Y:2020 09 2020 INSTALL OCCUPANCY SENSORS $446 $1,536 Implemented
WV0597 # 10 Y:2020 10 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $254 $191 Implemented
BS0140 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,952 $4,513 Implemented
BS0140 # 02 Y:2020 02 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $466 $319 Implemented
BS0140 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,058 $0 Implemented
BS0140 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,837 $642 Implemented
MZ0294 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $1,295 $2,760 Implemented
MZ0294 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $506 $50 Implemented
MZ0295 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,599 $34,694 Implemented
MZ0295 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $4,700 $3,360 Implemented
MZ0295 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,272 $240 Implemented
MZ0295 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,280 $550 Implemented
MZ0295 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,658 $3,500 Implemented
MZ0295 # 08 Y:2020 08 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,561 $360 Implemented
MZ0295 # 09 Y:2020 09 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $675 $322 Implemented
CL2009 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,388 $1,300 Implemented
CL2009 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,350 $1,650 Implemented
CL2009 # 04 Y:2020 04 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $9,407 $23,157 Implemented
IP0137 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $2,249 $0 Implemented
IP0137 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $609 $0 Implemented
IP0137 # 04 Y:2020 04 2020 RECOVER WASTE HEAT FROM EQUIPMENT $6,117 $2,100 Implemented
IP0137 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $789 $1,348 Implemented