IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

407

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0249 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,288 $20,400 Implemented
UM0249 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,027 $8,138 Implemented
UM0249 # 05 Y:2004 05 2004 OPTIMIZE PLANT POWER FACTOR $6,174 $27,270 Implemented
UM0249 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,436 $975 Implemented
UM0238 # 02 Y:2003 02 2003 COVER OPEN TANKS $28,130 $2,624 Implemented
UM0238 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,950 $150 Implemented
UM0238 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $6,485 $8,300 Implemented
UM0238 # 07 Y:2003 07 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,520 $895 Implemented
UM0233 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $2,064 $500 Implemented
UM0233 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,745 $150 Implemented
UM0233 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,037 $50 Implemented
UM0233 # 05 Y:2003 05 2003 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $26,000 $119,000 Implemented
UM0218 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $1,191 $200 Implemented
UM0218 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,305 $900 Implemented
UM0218 # 06 Y:2002 06 2002 RECOVER WASTE HEAT FROM EQUIPMENT $10,551 $3,000 Implemented
UM0218 # 07 Y:2002 07 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,604 $2,500 Implemented
UM0218 # 08 Y:2002 08 2002 INSULATE BARE EQUIPMENT $2,470 $800 Implemented
UM0218 # 10 Y:2002 10 2002 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,185 $100 Implemented
UM0205 # 01 Y:2002 01 2002 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $18,000 $5,940 Implemented
UM0205 # 02 Y:2002 02 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,300 $15,000 Implemented
UM0205 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,362 $300 Implemented
UM0205 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $932 $1,000 Implemented
UM0204 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $2,700 $4,970 Implemented
UM0204 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,220 $1,220 Implemented
UM0204 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,160 $500 Implemented