Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0095 # 05 Y:1997 | 05 | 1997 | INSTALL OCCUPANCY SENSORS | $1,553 | $225 | Implemented |
BD0095 # 04 Y:1997 | 04 | 1997 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,717 | $1,500 | Implemented |
BD0095 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,013 | $7,630 | Implemented |
BD0095 # 09 Y:1997 | 09 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $699 | $1,201 | Implemented |
BD0095 # 01 Y:1997 | 01 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,163 | $1,500 | Implemented |
BD0094 # 08 Y:1997 | 08 | 1997 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $150,800 | $2,000 | Implemented |
BD0094 # 07 Y:1997 | 07 | 1997 | TREAT AND REUSE RINSE WATERS | $16,735 | $34,000 | Implemented |
BD0094 # 06 Y:1997 | 06 | 1997 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $192,343 | $16,000 | Implemented |
BD0094 # 04 Y:1997 | 04 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,560 | $4,430 | Implemented |
BD0094 # 03 Y:1997 | 03 | 1997 | INSULATE BARE EQUIPMENT | $4,842 | $8,668 | Implemented |
BD0084 # 11 Y:1997 | 11 | 1997 | INSTALL EQUIPMENT TO MOVE PRODUCT | $5,726 | $2,500 | Implemented |
BD0084 # 08 Y:1997 | 08 | 1997 | RECOVER AND REUSE COOLING WATER | $8,749 | $7,500 | Implemented |
BD0084 # 01 Y:1997 | 01 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,581 | $5,500 | Implemented |
BD0083 # 12 Y:1997 | 12 | 1997 | INSTALL SENSORS TO DETECT DEFECTS | $2,600 | $725 | Implemented |
BD0083 # 08 Y:1997 | 08 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $348 | $0 | Implemented |
BD0083 # 07 Y:1997 | 07 | 1997 | USE SYNTHETIC LUBRICANT | $398 | $175 | Implemented |
BD0083 # 06 Y:1997 | 06 | 1997 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $455 | $529 | Implemented |
BD0083 # 04 Y:1997 | 04 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,241 | $450 | Implemented |
BD0083 # 03 Y:1997 | 03 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,552 | $2,800 | Implemented |
BD0083 # 02 Y:1997 | 02 | 1997 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,943 | $1,860 | Implemented |
BD0081 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $782 | $945 | Implemented |
BD0081 # 03 Y:1997 | 03 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $977 | $2,160 | Implemented |
BD0080 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,034 | $3,504 | Implemented |
BD0080 # 08 Y:1997 | 08 | 1997 | INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION | $2,430 | $400 | Implemented |
BD0080 # 07 Y:1997 | 07 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $422 | $450 | Implemented |