IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0541 # 09 Y:2015 09 2015 INSTALL SPECTRAL REFLECTORS / DELAMP $602 $280 Implemented
IA0541 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $557 $980 Implemented
IA0541 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,686 $214 Implemented
IA0541 # 06 Y:2015 06 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,690 $4,712 Implemented
IA0394 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,998 $25 Implemented
IA0394 # 02 Y:2006 02 2006 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $24,709 $6,500 Implemented
IA0394 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $41,729 $4,200 Implemented
IA0323 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,618 $1,298 Implemented
IA0323 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,455 $8,642 Implemented
IA0310 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $214 $266 Implemented
IA0310 # 05 Y:2003 05 2003 USE DEMAND CONTROLLER OR LOAD SHEDDER $12,468 $7,349 Implemented
IA0310 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $204 $0 Implemented
IA0310 # 07 Y:2003 07 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $523 $0 Implemented
IA0310 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,338 $5,828 Implemented
IA0285 # 07 Y:2002 07 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,018 $7,500 Implemented
IA0285 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $39,507 $800 Implemented
IA0285 # 05 Y:2002 05 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $46,580 $320 Implemented
IA0285 # 06 Y:2002 06 2002 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $12,642 $3,424 Implemented
IA0285 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,274 $458 Implemented
DS0156 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $253 $600 Implemented
DS0156 # 04 Y:2000 04 2000 METER WASTE WATER $9,582 $1,200 Implemented
DS0156 # 05 Y:2000 05 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $9,336 $-27,608 Implemented
DS0154 # 05 Y:2000 05 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $3,521 $1,336 Implemented
DS0154 # 06 Y:2000 06 2000 $4,884 $0 Implemented
DS0154 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $1,239 $864 Implemented