IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

770

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1059 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,947 $14,000 Implemented
UD1059 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,386 $1,200 Implemented
UD1059 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,047 $800 Implemented
UD1059 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $43,663 $1,000 Implemented
IP0169 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,007 $0 Implemented
IP0169 # 14 Y:2023 14 2023 DISCONNECT BALLASTS $7 $20 Implemented
IP0169 # 13 Y:2023 13 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,020 $7,379 Implemented
IP0169 # 11 Y:2023 11 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,267 $5,079 Implemented
IP0169 # 10 Y:2023 10 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,071 $15,432 Implemented
IP0169 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,451 $478 Implemented
IP0169 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,807 $69 Implemented
IP0169 # 03 Y:2023 03 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $141 $0 Implemented
IP0169 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,581 $1,991 Implemented
IP0169 # 09 Y:2023 09 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $786 $679 Implemented
IP0169 # 06 Y:2023 06 2023 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $5,069 $1,503 Implemented
IP0169 # 07 Y:2023 07 2023 USE RADIANT HEATER FOR SPOT HEATING $1,642 $661 Implemented
IP0169 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,155 $837 Implemented
UD1049 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $115,254 $300,000 Implemented
UD1049 # 07 Y:2023 07 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $27,897 $0 Implemented
UD1049 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,825 $0 Implemented
UD1048 # 03 Y:2022 03 2022 DISCONNECT BALLASTS $1,787 $0 Implemented
UD1028 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,408 $2,814 Implemented
UD1028 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $782 $0 Implemented
UD1027 # 09 Y:2021 09 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,013 $65,250 Implemented
UD1027 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,612 $0 Implemented