IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

549

matching recommendations
Reset
SIC 342 Cutlery, Handtools, And Hardware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0601 # 04 Y:1997 04 1997 INSULATE BARE EQUIPMENT $2,960 $295 Implemented
TN0601 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,045 $0 Implemented
AS0193 # 01 Y:1996 01 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $34,527 $45,000 Implemented
AS0193 # 02 Y:1996 02 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,963 $7,000 Implemented
AS0193 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $24,827 $17,598 Implemented
AS0193 # 04 Y:1996 04 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,838 $0 Implemented
AS0193 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,599 $25,001 Implemented
AS0193 # 07 Y:1996 07 1996 INSTALL OCCUPANCY SENSORS $881 $450 Implemented
AS0193 # 08 Y:1996 08 1996 REDUCE WATER USE WITH COUNTER CURRENT RINSING $24,214 $900 Implemented
ND0256 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $163 $597 Implemented
ND0256 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $520 $882 Implemented
ND0256 # 03 Y:1996 03 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $117 $57 Implemented
ND0256 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,172 $650 Implemented
ND0256 # 08 Y:1996 08 1996 REDUCE OR ELIMINATE WASTE $316 $700 Implemented
MS0064 # 02 Y:1996 02 1996 RECOVER WASTE HEAT FROM EQUIPMENT $12,252 $7,353 Implemented
MS0064 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,999 $35,867 Implemented
BD0046 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,921 $36,930 Implemented
BD0046 # 03 Y:1996 03 1996 INSTALL OCCUPANCY SENSORS $4,119 $2,550 Implemented
BD0046 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,521 $60 Implemented
BD0046 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,301 $5,169 Implemented
BD0046 # 08 Y:1996 08 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $11,229 $650 Implemented
WI0254 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,254 $270 Implemented
WI0254 # 04 Y:1995 04 1995 USE OPTIMUM THICKNESS INSULATION $1,323 $1,461 Implemented
WI0254 # 06 Y:1995 06 1995 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $404 $0 Implemented
OR0245 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,044 $4,000 Implemented