IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

171

matching recommendations
Reset
SIC 3423 Hand And Edge Tools, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0733 # 07 Y:2014 07 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $906 $1,800 Implemented
MA0733 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,616 $71,100 Implemented
MA0733 # 01 Y:2014 01 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $65,768 $10,000 Implemented
TT0103 # 01 Y:2012 01 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $19,502 $0 Implemented
TT0103 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,318 $5,300 Implemented
WM0013 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,980 $1,125 Implemented
WM0013 # 01 Y:2012 01 2012 USE SYNTHETIC LUBRICANT $31,970 $25,000 Implemented
MA0673 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $4,145 $1,370 Implemented
MA0673 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,078 $200 Implemented
MA0673 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,772 $540 Implemented
BD0356 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,914 $300 Implemented
BD0356 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,486 $0 Implemented
BD0356 # 06 Y:2009 06 2009 USE SYNTHETIC LUBRICANT $1,494 $300 Implemented
BD0356 # 07 Y:2009 07 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,823 $43,280 Implemented
WI0439 # 01 Y:2003 01 2003 INSTALL OCCUPANCY SENSORS $2,581 $5,500 Implemented
LM0044 # 04 Y:2002 04 2002 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $14,885 $0 Implemented
LM0044 # 05 Y:2002 05 2002 PURCHASE APPROPRIATELY SIZED MATERIAL $216,000 $3,400 Implemented
LM0044 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,025 $625 Implemented
NC0234 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $1,927 $500 Implemented
NC0234 # 02 Y:2002 02 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $744 $800 Implemented
NC0234 # 04 Y:2002 04 2002 DEVELOP A REPAIR/REPLACE POLICY $199 $289 Implemented
OK0628 # 05 Y:2001 05 2001 INCREASE AMOUNT OF CONDENSATE RETURNED $39,477 $20,922 Implemented
OK0628 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $357 $613 Implemented
OK0628 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $2,940 $3,013 Implemented
OK0628 # 04 Y:2001 04 2001 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,448 $1,500 Implemented