IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

171

matching recommendations
Reset
SIC 3423 Hand And Edge Tools, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0121 # 07 Y:1997 07 1997 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $7,488 $15,000 Implemented
NC0121 # 09 Y:1997 09 1997 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $1,375 $2,259 Implemented
TN0601 # 04 Y:1997 04 1997 INSULATE BARE EQUIPMENT $2,960 $295 Implemented
TN0601 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,045 $0 Implemented
WI0254 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,254 $270 Implemented
WI0254 # 04 Y:1995 04 1995 USE OPTIMUM THICKNESS INSULATION $1,323 $1,461 Implemented
WI0254 # 06 Y:1995 06 1995 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $404 $0 Implemented
KU0425 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,145 $14,000 Implemented
KU0425 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,695 $12,025 Implemented
KU0425 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $241 $150 Implemented
WI0155 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,747 $500 Implemented
MA0253 # 01 Y:1992 01 1992 RECOVER WASTE HEAT FROM EQUIPMENT $9,608 $15,134 Implemented
MA0253 # 02 Y:1992 02 1992 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $22,977 $5,000 Implemented
MA0253 # 03 Y:1992 03 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,697 $2,524 Implemented
MA0253 # 05 Y:1992 05 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,078 $2,000 Implemented
MA0253 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $3,216 $2 Implemented
MA0240 # 01 Y:1992 01 1992 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $83,013 $80 Implemented
MA0240 # 03 Y:1992 03 1992 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $16,723 $11 Implemented
MA0240 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,460 $2,355 Implemented
MA0240 # 05 Y:1992 05 1992 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,896 $0 Implemented
MA0240 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $1,400 $400 Implemented
MA0240 # 07 Y:1992 07 1992 REPAIR OR REPLACE STEAM TRAPS $1,348 $240 Implemented
MA0240 # 08 Y:1992 08 1992 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,022 $2,200 Implemented
RU0104 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $592 $0 Implemented
RU0104 # 02 Y:1990 02 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $513 $419 Implemented