Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
89
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0486 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,397 | $51,976 | Implemented |
WV0486 # 04 Y:2014 | 04 | 2014 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,358 | $1,000 | Implemented |
WV0486 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,550 | $688 | Implemented |
WV0486 # 07 Y:2014 | 07 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $262 | $519 | Implemented |
LE0370 # 01 Y:2014 | 01 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $3,349 | $0 | Implemented |
LE0370 # 02 Y:2014 | 02 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,947 | $35 | Implemented |
LE0370 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,490 | $200 | Implemented |
LE0370 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,076 | $1,000 | Implemented |
LE0370 # 05 Y:2014 | 05 | 2014 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,981 | $2,653 | Implemented |
LE0352 # 05 Y:2013 | 05 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,414 | $2,750 | Implemented |
LE0344 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $653 | $40 | Implemented |
LE0344 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,371 | $375 | Implemented |
WV0413 # 15 Y:2010 | 15 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,069 | $1,000 | Implemented |
WV0413 # 12 Y:2010 | 12 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,242 | $16,759 | Implemented |
WV0413 # 14 Y:2010 | 14 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,830 | $6,571 | Implemented |
WV0413 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $77,291 | $154,121 | Implemented |
WV0413 # 04 Y:2010 | 04 | 2010 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $59,435 | $55,000 | Implemented |
WV0413 # 06 Y:2010 | 06 | 2010 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $24,889 | $9,534 | Implemented |
WV0413 # 09 Y:2010 | 09 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $10,138 | $1,674 | Implemented |
WV0413 # 11 Y:2010 | 11 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,414 | $0 | Implemented |
WV0413 # 07 Y:2010 | 07 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $14,418 | $0 | Implemented |
WV0413 # 16 Y:2010 | 16 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $288 | $357 | Implemented |
LE0288 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,989 | $2,500 | Implemented |
LE0288 # 06 Y:2009 | 06 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,929 | $2,000 | Implemented |
LE0288 # 09 Y:2009 | 09 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,531 | $76,000 | Implemented |