IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 3441 Fabricated Structural Metal
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0971 # 09 Y:2017 09 2017 INSTALL SET-BACK TIMERS $977 $1,306 Implemented
OK0971 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,570 $10,263 Implemented
OK0971 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,254 $39,396 Implemented
OK0590 # 03 Y:2000 03 2000 BURN WASTE OIL FOR HEAT $2,892 $3,490 Implemented
OK0590 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,743 $1,613 Implemented
OK0389 # 03 Y:1992 03 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,437 $1,350 Implemented
OK0389 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $941 $1,348 Implemented
OK0389 # 01 Y:1992 01 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,084 $200 Implemented
OK0389 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $262 $1,385 Implemented
OK0284 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,250 $3,808 Implemented
OK0284 # 09 Y:1989 09 1989 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $1,525 $0 Implemented
OK0284 # 08 Y:1989 08 1989 RECOVER WASTE HEAT FROM EQUIPMENT $6,816 $2,140 Implemented
OK0284 # 07 Y:1989 07 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,197 $31,028 Implemented
OK0284 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $560 $3,432 Implemented
OK0284 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $289 $275 Implemented
OK0284 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $400 $825 Implemented
OK0284 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,480 $36,560 Implemented
OK0284 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $738 $1,250 Implemented
OK0245 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $80 $64 Implemented
OK0245 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $651 $0 Implemented
OK0245 # 03 Y:1988 03 1988 RECOVER WASTE HEAT FROM EQUIPMENT $1,523 $645 Implemented
OK0245 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $1,224 $1,710 Implemented
OK0212 # 03 Y:1986 03 1986 INSTALL TIMERS AND/OR THERMOSTATS $378 $450 Implemented
OK0212 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,403 $0 Implemented
OK0212 # 01 Y:1986 01 1986 RECOVER WASTE HEAT FROM EQUIPMENT $1,745 $485 Implemented