IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

419

matching recommendations
Reset
SIC 3442 Metal Doors, Sash, And Trim
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0216 # 02 Y:2005 02 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $103 $0 Implemented
SU0216 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $294 Implemented
SU0216 # 04 Y:2005 04 2005 USE SYNTHETIC LUBRICANT $193 $300 Implemented
SU0216 # 05 Y:2005 05 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $60,060 $134,400 Implemented
SU0216 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $416 $981 Implemented
SU0216 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,013 $17,360 Implemented
IA0353 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,450 $439 Implemented
IA0353 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $487 $40 Implemented
IA0353 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $950 $557 Implemented
IA0353 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21 $11 Implemented
IA0353 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $603 $444 Implemented
GT0788 # 01 Y:2004 01 2004 CHECK FOR ACCURACY OF UTILITY / POWER METERS $7,899 $0 Implemented
GT0788 # 05 Y:2004 05 2004 AIR CONDITION ONLY SPACE NECESSARY $8,123 $3,450 Implemented
GT0788 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,890 $0 Implemented
GT0788 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $144 $1,100 Implemented
GT0788 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,396 $3,768 Implemented
GT0788 # 09 Y:2004 09 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $760 $1,200 Implemented
AM0469 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,900 $400 Implemented
AM0469 # 03 Y:2004 03 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,000 $0 Implemented
AM0469 # 04 Y:2004 04 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,460 $170 Implemented
AM0469 # 06 Y:2004 06 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $340 $0 Implemented
MI0082 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $10,385 $2,300 Implemented
MI0082 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,282 $2,670 Implemented
AM0457 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,750 $21 Implemented
AM0457 # 02 Y:2004 02 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,360 $4,370 Implemented