IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

673

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0601 # 08 Y:2013 08 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $2,164 $8,104 Implemented
WM0019 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,444 $510 Implemented
WM0019 # 03 Y:2013 03 2013 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,791 $1,350 Implemented
WM0019 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $915 $0 Implemented
CO0659 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,680 $25,960 Implemented
CO0659 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,470 $500 Implemented
CO0659 # 05 Y:2012 05 2012 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,570 $0 Implemented
WM0002 # 07 Y:2012 07 2012 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,884 $0 Implemented
WM0002 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,844 $55,770 Implemented
UD0855 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,100 $0 Implemented
UD0855 # 04 Y:2012 04 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,089 $0 Implemented
UD0855 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,665 $1,000 Implemented
UD0855 # 06 Y:2012 06 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,118 $0 Implemented
UD0855 # 08 Y:2012 08 2012 REDUCE VENTILATION AIR $2,956 $6,600 Implemented
MI0219 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,275 $1,660 Implemented
MI0219 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $5,535 $1,800 Implemented
MI0219 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $2,739 $6,080 Implemented
MI0219 # 07 Y:2012 07 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $895 $2,320 Implemented
MI0219 # 08 Y:2012 08 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $734 $120 Implemented
MI0219 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,003 $37,014 Implemented
UD0845 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $534 $0 Implemented
UD0845 # 03 Y:2011 03 2011 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,285 $4,000 Implemented
UM0398 # 03 Y:2011 03 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,186 $0 Implemented
UM0398 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $1,482 $1,157 Implemented
UM0398 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,477 $500 Implemented