IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0305 # 07 Y:2001 07 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $63,963 $6,820 Implemented
AS0305 # 06 Y:2001 06 2001 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $14,000 $1,360 Implemented
AS0305 # 05 Y:2001 05 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,588 $110 Implemented
AS0304 # 09 Y:2001 09 2001 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $16,000 $3,940 Implemented
AS0304 # 08 Y:2001 08 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $19,493 $294 Implemented
AS0304 # 05 Y:2001 05 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $64,704 $8,580 Implemented
AS0304 # 04 Y:2001 04 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,488 $648 Implemented
AS0301 # 04 Y:2001 04 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,032 $110 Implemented
AS0252 # 05 Y:1999 05 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $515 $80 Implemented
AS0252 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,570 $220 Implemented
AS0250 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,394 $1,000 Implemented
AS0250 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,741 $120 Implemented
AS0219 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,071 $60 Implemented
AS0219 # 06 Y:1998 06 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $36 $30 Implemented
AS0219 # 05 Y:1998 05 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,425 $1,500 Implemented
AS0219 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,138 $2,957 Implemented
AS0219 # 02 Y:1998 02 1998 USE SYNTHETIC LUBRICANT $101 $268 Implemented
AS0219 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,150 $2,888 Implemented
AS0158 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,900 $2,900 Implemented
AS0153 # 07 Y:1995 07 1995 INSTALL TIMERS AND/OR THERMOSTATS $536 $1,000 Implemented
AS0153 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $393 $0 Implemented
AS0153 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,551 $3,779 Implemented
AS0153 # 02 Y:1995 02 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,000 $0 Implemented
AS0153 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,342 $4,568 Implemented
AS0110 # 07 Y:1994 07 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $965 $400 Implemented