IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0091 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,051 $230 Implemented
WM0019 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,444 $510 Implemented
WM0019 # 03 Y:2013 03 2013 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,791 $1,350 Implemented
WM0019 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $915 $0 Implemented
WM0002 # 07 Y:2012 07 2012 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,884 $0 Implemented
WM0002 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,844 $55,770 Implemented
WI0340 # 01 Y:1999 01 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,153 $30,618 Implemented
WI0340 # 07 Y:1999 07 1999 INSTALL OCCUPANCY SENSORS $470 $150 Implemented
WI0340 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,340 $2,000 Implemented
WI0340 # 04 Y:1999 04 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,051 $0 Implemented
WI0319 # 06 Y:1998 06 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $214 $0 Implemented
WI0291 # 06 Y:1997 06 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $1,693 $0 Implemented
WI0291 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,099 $360 Implemented
WI0291 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,229 $20,892 Implemented
WI0269 # 01 Y:1996 01 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $128,670 $10,000 Implemented
WI0269 # 11 Y:1996 11 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,692 $825 Implemented
WI0269 # 10 Y:1996 10 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,653 $180 Implemented
WI0269 # 07 Y:1996 07 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,269 $0 Implemented
WI0269 # 05 Y:1996 05 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,044 $17,980 Implemented
WI0269 # 04 Y:1996 04 1996 DISTILL CONTAMINATED SOLVENTS FOR REUSE $14,920 $22,000 Implemented