Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
261
matching recommendationsSIC | 3452 | Bolts, Nuts, Rivets, And Washers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0275 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $29,059 | $900 | Implemented |
WV0275 # 06 Y:2003 | 06 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,654 | $800 | Implemented |
WV0275 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,244 | $8,370 | Implemented |
WV0275 # 08 Y:2003 | 08 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,170 | $360 | Implemented |
WV0275 # 10 Y:2003 | 10 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,549 | $500 | Implemented |
WV0275 # 14 Y:2003 | 14 | 2003 | INSTALL OCCUPANCY SENSORS | $2,336 | $1,200 | Implemented |
CO0508 # 02 Y:2002 | 02 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,230 | $7,000 | Implemented |
CO0508 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,450 | $90 | Implemented |
CO0508 # 04 Y:2002 | 04 | 2002 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $31,960 | $1,620 | Implemented |
IC0035 # 10 Y:2002 | 10 | 2002 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $4,000 | $3,500 | Implemented |
IC0035 # 09 Y:2002 | 09 | 2002 | RECOVER AND REUSE WASTE MATERIAL | $97 | $120 | Implemented |
IC0035 # 08 Y:2002 | 08 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,977 | $4,813 | Implemented |
IC0035 # 02 Y:2002 | 02 | 2002 | INSULATE BARE EQUIPMENT | $12,947 | $2,657 | Implemented |
IC0035 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,103 | $83,780 | Implemented |
WI0414 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,225 | $0 | Implemented |
WI0414 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $754 | $350 | Implemented |
WI0414 # 07 Y:2002 | 07 | 2002 | INSTALL OCCUPANCY SENSORS | $1,071 | $2,400 | Implemented |
WI0414 # 04 Y:2002 | 04 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,730 | $0 | Implemented |
BD0196 # 10 Y:2001 | 10 | 2001 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $2,862 | $750 | Implemented |
BD0196 # 06 Y:2001 | 06 | 2001 | INSTALL OCCUPANCY SENSORS | $984 | $1,725 | Implemented |
BD0196 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,477 | $200 | Implemented |
MA0490 # 01 Y:2001 | 01 | 2001 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $7,248 | $0 | Implemented |
MA0490 # 07 Y:2001 | 07 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,000 | $0 | Implemented |
MA0490 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,500 | $390 | Implemented |
MA0490 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,100 | $1,000 | Implemented |