IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,137

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0542 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,513 $14,128 Implemented
WI0318 # 01 Y:1998 01 1998 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $89,367 $0 Implemented
WI0318 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $555 $0 Implemented
WI0318 # 06 Y:1998 06 1998 INSULATE BARE EQUIPMENT $417 $742 Implemented
WI0318 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $331 $571 Implemented
SD0190 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,869 $11,580 Implemented
SD0190 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,620 $1,350 Implemented
SD0190 # 06 Y:1998 06 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,072 $0 Implemented
SD0190 # 09 Y:1998 09 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,443 $6,942 Implemented
SD0190 # 10 Y:1998 10 1998 INSTALL SPECTRAL REFLECTORS / DELAMP $2,302 $2,150 Implemented
SD0190 # 11 Y:1998 11 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,500 $9,000 Implemented
UM0112 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $852 $1,450 Implemented
UM0112 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,169 $2,110 Implemented
UM0112 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,116 $1,000 Implemented
UM0105 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,866 $14,437 Implemented
UM0105 # 05 Y:1998 05 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $15,625 $58,992 Implemented
AM0312 # 01 Y:1998 01 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $30,640 $1,200 Implemented
AM0312 # 02 Y:1998 02 1998 REPAIR AND ELIMINATE STEAM LEAKS $24,560 $5,000 Implemented
AM0312 # 03 Y:1998 03 1998 METER WASTE WATER $17,000 $4,800 Implemented
AM0312 # 04 Y:1998 04 1998 OPTIMIZE PLANT POWER FACTOR $3,700 $8,650 Implemented
AM0312 # 05 Y:1998 05 1998 INSULATE BARE EQUIPMENT $2,780 $2,790 Implemented
AM0312 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,790 $15 Implemented
AM0312 # 07 Y:1998 07 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $1,710 $1,250 Implemented
AM0312 # 08 Y:1998 08 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,190 $350 Implemented
AM0312 # 09 Y:1998 09 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $465 $30 Implemented