IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,137

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1501 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,967 $500 Implemented
UK1501 # 05 Y:2015 05 2015 UPGRADE CONTROLS ON COMPRESSORS $5,665 $20,000 Implemented
UK1501 # 08 Y:2015 08 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,683 $3,294 Implemented
UK1501 # 14 Y:2015 14 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $17,085 $1,000 Implemented
UD0920 # 01 Y:2015 01 2015 COMBINE UTILITY METERS $13,359 $0 Implemented
UD0920 # 12 Y:2015 12 2015 CONVERT TO AQUEOUS CLEANING SYSTEM $6,095 $7,375 Implemented
UM0453 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,831 $1,000 Implemented
UM0453 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,442 $1,500 Implemented
UM0453 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $7,852 $4,000 Implemented
WM0060 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,761 $2,291 Implemented
WM0060 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,355 $0 Implemented
WM0060 # 04 Y:2015 04 2015 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $3,701 $1,218 Implemented
WM0060 # 05 Y:2015 05 2015 REPAIR AND ELIMINATE STEAM LEAKS $1,080 $110 Implemented
WM0060 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $786 $3,000 Implemented
WM0060 # 07 Y:2015 07 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $680 $255 Implemented
UM0451 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $6,320 $4,800 Implemented
UM0451 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $16,165 $25,000 Implemented
WV0495 # 04 Y:2014 04 2014 INSTALL SET-BACK TIMERS $10,203 $4,200 Implemented
WV0495 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,578 $7,154 Implemented
WV0495 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $5,177 $5,764 Implemented
WV0495 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,890 $5,211 Implemented
WV0495 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,156 $725 Implemented
TT0135 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,394 $100 Implemented
TT0135 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,172 $3,000 Implemented
TT0135 # 04 Y:2014 04 2014 APPLY FOR INVESTMENT INCENTIVES $31,797 $5,000 Implemented