Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,294
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0102 # 10 Y:2013 | 10 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $166 | $2,000 | Implemented |
TT0102 # 11 Y:2013 | 11 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,176 | $4,134 | Implemented |
TT0102 # 12 Y:2013 | 12 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $110 | $1,092 | Implemented |
TT0102 # 13 Y:2013 | 13 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $64 | $120 | Implemented |
MAS035 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,986 | $2,000 | Implemented |
MAS035 # 02 Y:2012 | 02 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,443 | $0 | Implemented |
WV0458 # 02 Y:2012 | 02 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $32,380 | $1,700 | Implemented |
WV0458 # 07 Y:2012 | 07 | 2012 | INSULATE BARE EQUIPMENT | $1,138 | $573 | Implemented |
WV0458 # 05 Y:2012 | 05 | 2012 | DEVELOP A REPAIR/REPLACE POLICY | $2,928 | $770 | Implemented |
WV0458 # 04 Y:2012 | 04 | 2012 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $2,949 | $1,000 | Implemented |
WV0457 # 11 Y:2012 | 11 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $330 | $50 | Implemented |
WV0457 # 07 Y:2012 | 07 | 2012 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,189 | $1,000 | Implemented |
WV0457 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $2,539 | $5,407 | Implemented |
WV0457 # 03 Y:2012 | 03 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,482 | $500 | Implemented |
WV0457 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,986 | $22,500 | Implemented |
MZ0085 # 02 Y:2012 | 02 | 2012 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $79,573 | $6,500 | Implemented |
MZ0085 # 03 Y:2012 | 03 | 2012 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $72,621 | $8,500 | Implemented |
MZ0085 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,801 | $8,200 | Implemented |
MA0691 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $772 | $1,575 | Implemented |
MA0691 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $249 | $200 | Implemented |
MAS022 # 01 Y:2012 | 01 | 2012 | INSULATE BARE EQUIPMENT | $19,167 | $20,900 | Implemented |
MAS022 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,821 | $2,600 | Implemented |
MAS022 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,186 | $4,660 | Implemented |
MAS022 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $875 | $0 | Implemented |
IA0464 # 04 Y:2011 | 04 | 2011 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,199 | $45 | Implemented |