IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,294

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0593 # 08 Y:2023 08 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,486 $9,050 Implemented
SF0593 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $822 $334 Implemented
SF0593 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,621 $0 Implemented
TR0028 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,584 $602 Implemented
TR0028 # 05 Y:2022 05 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $787 $1,511 Implemented
TR0028 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,972 $3,155 Implemented
UW2208 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,664 $2,080 Implemented
UW2208 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,686 $122 Implemented
UW2208 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $2,680 Implemented
UW2208 # 01 Y:2022 01 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $643 $0 Implemented
UW2206 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,718 $0 Implemented
UW2206 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $782 $0 Implemented
UW2206 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,058 $2,080 Implemented
UW2206 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $999 $2,199 Implemented
UW2206 # 02 Y:2022 02 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $567 $122 Implemented
SU0516 # 09 Y:2022 09 2022 REDUCE VENTILATION AIR $1,107 $2,030 Implemented
SU0516 # 02 Y:2022 02 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,098 $31 Implemented
SU0516 # 04 Y:2022 04 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $858 $160 Implemented
SU0516 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $439 $0 Implemented
SU0516 # 07 Y:2022 07 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $857 $696 Implemented
SU0516 # 06 Y:2022 06 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $336 $194 Implemented
SU0516 # 03 Y:2022 03 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,957 $290 Implemented
MA0844 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,466 $23,175 Implemented
MI0403 # 02 Y:2022 02 2022 UPGRADE CONTROLS ON COMPRESSORS $11,648 $5,536 Implemented
MI0403 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $15,827 $43,707 Implemented