IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0235 # 04 Y:2006 04 2006 USE SYNTHETIC LUBRICANT $247 $0 Implemented
SU0235 # 03 Y:2006 03 2006 CHECK FOR ACCURACY OF UTILITY / POWER METERS $255 $0 Implemented
SU0235 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,954 $0 Implemented
SU0235 # 01 Y:2006 01 2006 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,295 $0 Implemented
SU0235 # 08 Y:2006 08 2006 INSULATE FEEDWATER TANK $3,650 $720 Implemented
SU0156 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,059 $0 Implemented
SU0156 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,534 $327 Implemented
SU0156 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $2,283 $995 Implemented
SU0156 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,081 $8,364 Implemented
SU0156 # 01 Y:2003 01 2003 RECOVER AND REUSE SPENT ACID BATHS $21,400 $1,800 Implemented
SU0126 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,917 $307 Implemented
SU0126 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $18,512 $3,152 Implemented
SU0106 # 01 Y:2001 01 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,051 $0 Implemented
SU0106 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,158 $500 Implemented
SU0106 # 05 Y:2001 05 2001 OPTIMIZE PLANT POWER FACTOR $3,243 $10,210 Implemented
HO0181 # 03 Y:1998 03 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $532 $325 Implemented
HO0181 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $1,232 $1,008 Implemented
HO0181 # 05 Y:1998 05 1998 INSULATE FEEDWATER TANK $227 $72 Implemented
HO0181 # 06 Y:1998 06 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,922 $250 Implemented
MA0400 # 05 Y:1997 05 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $388 $0 Implemented
MA0400 # 03 Y:1997 03 1997 COVER OPEN TANKS $15,677 $6,578 Implemented
HO0148 # 01 Y:1997 01 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,488 $2,196 Implemented
HO0148 # 07 Y:1997 07 1997 $8,676 $100 Implemented
HO0148 # 06 Y:1997 06 1997 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $10,000 $10,000 Implemented
HO0148 # 03 Y:1997 03 1997 $9,425 $5,000 Implemented