IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,294

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0218 # 06 Y:2002 06 2002 RECOVER WASTE HEAT FROM EQUIPMENT $10,551 $3,000 Implemented
UM0218 # 07 Y:2002 07 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,604 $2,500 Implemented
UM0218 # 08 Y:2002 08 2002 INSULATE BARE EQUIPMENT $2,470 $800 Implemented
UM0218 # 10 Y:2002 10 2002 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,185 $100 Implemented
CO0505 # 03 Y:2002 03 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,940 $5,400 Implemented
CO0505 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,800 $600 Implemented
CO0505 # 07 Y:2002 07 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $770 $60 Implemented
AS0327 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,614 $200 Implemented
AS0327 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,352 $3,671 Implemented
AS0327 # 05 Y:2002 05 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $863 $2,450 Implemented
AS0327 # 06 Y:2002 06 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $9,397 $2,000 Implemented
AS0327 # 10 Y:2002 10 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,804 $108 Implemented
WV0239 # 12 Y:2002 12 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $7,200 $100 Implemented
WV0239 # 10 Y:2002 10 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,680 $300 Implemented
WV0239 # 09 Y:2002 09 2002 RECOVER WASTE HEAT FROM EQUIPMENT $18,443 $140 Implemented
WV0239 # 07 Y:2002 07 2002 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,408 $1,044 Implemented
WV0239 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,529 $0 Implemented
WV0239 # 05 Y:2002 05 2002 USE OPTIMUM THICKNESS INSULATION $3,072 $1,080 Implemented
WV0239 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,082 $500 Implemented
WV0239 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,858 $13,440 Implemented
UD0646 # 01 Y:2002 01 2002 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $33,646 $32,000 Implemented
UD0646 # 02 Y:2002 02 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $25,468 $12,700 Implemented
UD0646 # 04 Y:2002 04 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,685 $2,000 Implemented
UD0646 # 10 Y:2002 10 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $379 $499 Implemented
IC0037 # 02 Y:2002 02 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $472 $440 Implemented