IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0691 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $772 $1,575 Implemented
MA0691 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $249 $200 Implemented
MAS022 # 01 Y:2012 01 2012 INSULATE BARE EQUIPMENT $19,167 $20,900 Implemented
MAS022 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $4,821 $2,600 Implemented
MAS022 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $875 $0 Implemented
MAS022 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,186 $4,660 Implemented
MA0663 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $938 $600 Implemented
MA0562 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $361 $512 Implemented
MA0562 # 02 Y:2004 02 2004 RECOVER WASTE HEAT FROM EQUIPMENT $10,584 $2,465 Implemented
MA0562 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,626 $250 Implemented
MA0562 # 03 Y:2004 03 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,445 $650 Implemented
MA0557 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $1,340 Implemented
MA0557 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $1,706 $708 Implemented
MA0557 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,428 $3,450 Implemented
MA0557 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $5,528 $3,118 Implemented
MA0544 # 01 Y:2003 01 2003 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $3,663 $2,000 Implemented
MA0544 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $543 $20 Implemented
MA0544 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,646 $6,156 Implemented
MA0459 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $55 $248 Implemented
MA0459 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $789 $150 Implemented
MA0459 # 02 Y:2000 02 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,064 $150 Implemented
MA0448 # 07 Y:1999 07 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $316 $1,425 Implemented
MA0448 # 06 Y:1999 06 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $558 $0 Implemented
MA0448 # 04 Y:1999 04 1999 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $1,558 $5,000 Implemented
MA0448 # 03 Y:1999 03 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,455 $80 Implemented