IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,321

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0001 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $441 $237 Implemented
TR0001 # 06 Y:2017 06 2017 INSTALL REPLACEMENT DOORS $9,766 $5,000 Implemented
TR0001 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,442 $2,500 Implemented
TR0001 # 08 Y:2017 08 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,422 $6 Implemented
MA0773 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,580 $14,050 Implemented
MA0773 # 03 Y:2017 03 2017 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,593 $10,625 Implemented
MA0773 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,500 $1,000 Implemented
SU0438 # 02 Y:2017 02 2017 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $467 $936 Implemented
SU0438 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $59 $66 Implemented
SU0438 # 04 Y:2017 04 2017 REDUCE VENTILATION AIR $449 $600 Implemented
SU0438 # 06 Y:2017 06 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,174 $3,708 Implemented
SD0547 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,853 $20,582 Implemented
SD0547 # 02 Y:2017 02 2017 USE PHOTOCELL CONTROLS $3,679 $11,568 Implemented
SD0547 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,165 $1,500 Implemented
SD0547 # 05 Y:2017 05 2017 INSULATE BARE EQUIPMENT $1,326 $750 Implemented
SD0547 # 07 Y:2017 07 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $689 $567 Implemented
IP0081 # 01 Y:2017 01 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,110 $0 Implemented
IP0081 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,216 $0 Implemented
IP0081 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $72 $0 Implemented
IP0081 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,798 $35 Implemented
IP0081 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,865 $390 Implemented
IP0081 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $832 $1,358 Implemented
IP0081 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $201 $409 Implemented
MA0769 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $90,487 $39,330 Implemented
WV0540 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $1,394 $635 Implemented