IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,321

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0265 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,775 $59,467 Implemented
MS0265 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,680 $189 Implemented
MS0264 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,471 $84,783 Implemented
MS0264 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,737 $318 Implemented
IC0090 # 01 Y:2004 01 2004 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $17,317 $0 Implemented
IC0090 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,918 $300 Implemented
IC0090 # 04 Y:2004 04 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,643 $9,400 Implemented
IC0090 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $559 $77 Implemented
CO0555 # 01 Y:2004 01 2004 REVISE SMOKE CLEANUP FROM OPERATIONS $4,790 $13,100 Implemented
CO0555 # 02 Y:2004 02 2004 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $900 $580 Implemented
CO0555 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $186 $260 Implemented
BD0273 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,813 $3,470 Implemented
BD0273 # 02 Y:2004 02 2004 INSTALL WIND POWERED ELECTRIC GENERATOR $10,682 $50,000 Implemented
BD0273 # 03 Y:2004 03 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $6,786 $3,000 Implemented
BD0273 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,606 $4,270 Implemented
BD0273 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,942 $255 Implemented
BD0273 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $2,608 $1,725 Implemented
BD0273 # 07 Y:2004 07 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,185 $2,900 Implemented
BD0273 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,098 $0 Implemented
BD0273 # 09 Y:2004 09 2004 USE PLASTIC PALLETS INSTEAD OF WOOD $22,476 $27,625 Implemented
BD0273 # 10 Y:2004 10 2004 UTILIZE OUTSIDE CONTRACTING $14,286 $200 Implemented
BD0272 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $42,617 $1,000 Implemented
BD0272 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $18,914 $1,000 Implemented
BD0272 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $13,459 $1,260 Implemented
BD0272 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,568 $4,325 Implemented