Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
68
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0890 # 04 Y:2014 | 04 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,200 | $0 | Implemented |
OK0890 # 06 Y:2014 | 06 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,700 | $0 | Implemented |
OK0890 # 07 Y:2014 | 07 | 2014 | USE MINIMUM SAFE OVEN VENTILATION | $30,394 | $1,000 | Implemented |
OK0890 # 02 Y:2014 | 02 | 2014 | INSTALL COMMON HEADER ON COMPRESSORS | $8,687 | $4,800 | Implemented |
OK0890 # 05 Y:2014 | 05 | 2014 | AIR CONDITION ONLY SPACE NECESSARY | $6,400 | $1,230 | Implemented |
OK0851 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,400 | $1,900 | Implemented |
OK0851 # 05 Y:2013 | 05 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $7,400 | $44,200 | Implemented |
OK0844 # 03 Y:2013 | 03 | 2013 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $11,299 | $76,750 | Implemented |
OK0844 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,922 | $21,000 | Implemented |
OK0844 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,154 | $4,200 | Implemented |
TT0063 # 04 Y:2011 | 04 | 2011 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $900 | $1,050 | Implemented |
LL0281 # 05 Y:2007 | 05 | 2007 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,808 | $900 | Implemented |
LL0281 # 01 Y:2007 | 01 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,512 | $735 | Implemented |
LL0281 # 02 Y:2007 | 02 | 2007 | INSULATE BARE EQUIPMENT | $9,842 | $1,585 | Implemented |
LL0281 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,804 | $2,400 | Implemented |
LL0281 # 04 Y:2007 | 04 | 2007 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $5,988 | $120 | Implemented |
LL0281 # 06 Y:2007 | 06 | 2007 | INSULATE BARE EQUIPMENT | $1,708 | $1,588 | Implemented |
AR0185 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,559 | $260 | Implemented |
AR0185 # 03 Y:2000 | 03 | 2000 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $16,446 | $15,663 | Implemented |
AR0162 # 06 Y:1999 | 06 | 1999 | INCREASE USE OF AUTOMATION | $29,203 | $25,000 | Implemented |
AR0162 # 05 Y:1999 | 05 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $29,203 | $0 | Implemented |
AR0162 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $636 | $952 | Implemented |
AR0148 # 01 Y:1998 | 01 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,477 | $500 | Implemented |
AR0148 # 08 Y:1998 | 08 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $4,787 | $1,000 | Implemented |
AR0148 # 06 Y:1998 | 06 | 1998 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $39,295 | $91,825 | Implemented |