IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1041 # 05 Y:2021 05 2021 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $614 $219 Implemented
OK1041 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $896 $1,927 Implemented
OK1041 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,223 $1,690 Implemented
OK1041 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,337 $28,697 Implemented
MZ0287 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,540 $2,484 Implemented
MZ0287 # 07 Y:2020 07 2020 OPTIMIZE PLANT POWER FACTOR $937 $4,000 Implemented
MZ0287 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $2,755 $5,978 Implemented
MZ0287 # 05 Y:2020 05 2020 RECOVER WASTE HEAT FROM EQUIPMENT $2,939 $356 Implemented
MZ0287 # 04 Y:2020 04 2020 USE RADIANT HEATER FOR SPOT HEATING $4,983 $6,696 Implemented
MZ0287 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,049 $14,550 Implemented
MZ0287 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,461 $1,310 Implemented
OK0845 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,354 $12,299 Implemented
OK0845 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,941 $550 Implemented
OK0845 # 06 Y:2013 06 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $318 $1,584 Implemented
MZ0052 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,361 $18,360 Implemented
MZ0052 # 04 Y:2010 04 2010 OPTIMIZE PLANT POWER FACTOR $9,103 $8,984 Implemented
MZ0052 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,855 $16,700 Implemented
KU0532 # 02 Y:1999 02 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,040 $20,000 Implemented
KU0532 # 08 Y:1999 08 1999 RECYCLE CLEANING SOLVENT AND REUSE $2,620 $800 Implemented
KU0532 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $360 Implemented
KU0532 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $700 $450 Implemented
KU0532 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,060 $12,170 Implemented
KU0498 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $340 $630 Implemented
KU0498 # 06 Y:1998 06 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $320 $0 Implemented
KU0498 # 08 Y:1998 08 1998 IMPLEMENT A MACHINE AND COOLANT SUMP CLEANING PROGRAM TO MINIMIZE COOLANT CONTAMINATION $3,150 $1,450 Implemented